Time Warner Cable

City Of Boerne Pole Loading Project: TXUE performed pole loading analysis for Time Warner Cable (TWC) on all Boerne Electric-owned utility poles prior to TWC’s buildout of the City of Boerne. Field data was acquired pertaining to utility pole attributes (pole size, conductors, crossarms, OH equipment, guys, anchor, angles, etc.) and facility-attachment attributes (fiber counts, bundle-sizes, sag, angles, etc.) for over 2,500 utility poles in the area.

Utilizing pole loading software, the acquired field data was analyzed, taking into account wind speed and angle, ice buildup, load angles and heights, and all pertinent electric codes. Sophisticated reporting and charts, 2D/3D viewing of pole configurations, and summaries of critical loading data, were provided to our client.